AC 7-22KW
Dual-Charging
Fast EV Charger
Self-developed brand-new appearance, soft lines can adapt to a variety of color schemes, to maximize the customer’s customized appearance needs
 
						
					 
						
					 
											 
						
					 
											
Length: 5m / 7m / 10m
 
											
Logo printing: Laser / Silk-screen
 
											
TYPE1 / TYPE2 / GBT
 
						
					Application scenario: underground parking lot of residential and commercial buildings
Product selection: AC floor-stand EV charging station or wallbox EV charger
Application scenario: the area where the public parking lot of community vehicles needs to be charged.
Product selection: single-phase AC pile
1. Save space and cost. Single-phase AC pile supports both wall-mounted and floor-stand installation methods.
2.Low operating cost: charging piles are managed in clusters through energy gateways. Each energy gateway can control 8-12 electric piles at the sam time, greatly reducing the operating cost.
3. Strong compatibility, compatible with parking lot management system
1. Flexible adaptation. equipped with various charging piles. Users can freely combine, flexibly choose fast charging and slow charging, and reasonably allocate time.
2. Strong compatibility, compatible with parking lot management system
3. It is safe and reliable. The charging pile has a variety of protection functions and temperature detection functions to avoid over heating during charging. The charging pile has anti – tipping protection. When the tilt reaches more than 30 degrees, the charging pile will automatically power off for protection.